SENATE AMENDMENT
    Bill No. CS for SB 54-A
    Amendment No. ___   Barcode 554986
                            CHAMBER ACTION
              Senate                               House
                                   .                    
                                   .                    
 1                  2/AD/2R        .                    
       05/21/2003 06:50 PM         .                    
 2                                 .                    
                                   .                    
 3                                 .                    
                                   .                    
 4  ______________________________________________________________
 5  
 6  
 7  
 8  
 9  
10  ______________________________________________________________
11  Senator Lawson moved the following amendment:
12  
13         Senate Amendment (with title amendment) 
14         On page 42, between lines 28 and 29,
15  
16  insert:  
17         Section 19.  Paragraph (b) of subsection (3) of section
18  373.1502, Florida Statutes, is amended to read:
19         373.1502  Regulation of comprehensive plan project
20  components.--
21         (3)  REGULATION OF COMPREHENSIVE PLAN STRUCTURES AND
22  FACILITIES.--
23         (b)  The department shall issue a permit for a term of
24  5 years for the construction, operation, modification, or
25  maintenance of a project component based on the criteria set
26  forth in this section. If the department is the entity
27  responsible for the construction, operation, modification, or
28  maintenance of any individual project component, the district
29  shall issue a permit for a term of 5 years based on the
30  criteria set forth in this section. The permit application
31  must provide reasonable assurances that:
                                  1
    10:15 AM   05/21/03                             s0054A.nr06.Fa
                                                  SENATE AMENDMENT
    Bill No. CS for SB 54-A
    Amendment No. ___   Barcode 554986
 1         1.  The project component will achieve the design
 2  objectives set forth in the detailed design documents
 3  submitted as part of the application.
 4         2.  State water quality standards, including water
 5  quality criteria and moderating provisions will be met to the
 6  maximum extent practicable. Under no circumstances shall the
 7  project component cause or contribute to violation of state
 8  water quality standards.
 9         3.  Discharges from the project component will not pose
10  a serious danger to public health, safety, or welfare.
11         4.  Any impacts to wetlands or threatened or endangered
12  species resulting from implementation of the project component
13  will be avoided, minimized, and mitigated, as appropriate.
14  
15  (Redesignate subsequent sections.)
16  
17  
18  ================ T I T L E   A M E N D M E N T ===============
19  And the title is amended as follows:
20         On page 3, line 30, after the semicolon
21  
22  insert:
23         amending s. 373.1502, F.S.; providing for the
24         regulation of comprehensive plan project
25         components; revising requirements that permit
26         applications provide assurances that state
27         water quality standards will be met to the
28         maximum extent practicable;
29  
30  
31  
                                  2
    10:15 AM   05/21/03                             s0054A.nr06.Fa