4. The business project is located in this state; and
9
5. The jobs created by the business project pay an
10
estimated annual average wage that equals at least 130 percent of
11
the average private sector wage. The average wage requirement
12
may be waived if the office and the commission determine that the
13
merits of the individual project or the specific circumstances
14
warrant such action; and
15
6. The business project meets one of the following
16
criteria:
17
a. Results in the creation of at least 35 direct, new jobs
18
at the business; or
19
b. Has an activity or product that uses feedstock or other
20
raw materials grown or produced in this state; or
21
c. Has a cumulative investment of at least $50 million
22
within a 5-year period.
23
d. The project shall address technical feasibility of the
24
technology, and the extent to which the proposed project has been
25
demonstrated to be technically feasible based on pilot project
26
demonstrations, laboratory testing, scientific modeling, or
27
engineering or chemical theory that supports the proposal.
28
e. The project shall include innovative technology and the
29
degree to which the project or business incorporates an
30
innovative new technology or an innovative application of an
31
existing technology.
32
f. The project shall include production potential and the
33
degree to which a project or business generates thermal,
34
mechanical, or electrical energy by means of a renewable energy
35
resource that has substantial long-term production potential.
36
The project must, to the extent possible, quantify annual
37
production potential in megawatts or kilowatts.
38
g. The project shall include and address energy efficiency
39
and the degree to which a project demonstrates efficient use of
40
energy, water, and material resources.
41
h. The project shall include project management and the
42
ability of management to administer a complete the business
43