Florida Senate - 2008 SENATOR AMENDMENT

Bill No. CS for CS for CS for SB 1544

396144

CHAMBER ACTION

Senate

Floor: 12/AD/2R

4/17/2008 10:28 AM

.

.

.

.

.

House



1

Senator Saunders moved the following amendment:

2

3

     Senate Amendment (with directory and title amendments)

4

     Delete line(s) 1787-1822

5

and insert:

6

practicable alternative available for placement of the electric

7

utility transmission lines on the department's rights-of-way, the

8

department's rules shall provide for placement of and access to

9

such transmission lines adjacent to and within the right-of-way

10

of any department-controlled public roads, including

11

longitudinally within limited access facilities to the greatest

12

extent allowed by federal law, if compliance with the standards

13

established by such rules is achieved. Such rules may include,

14

but need not be limited to, that the use of the right-of-way is

15

reasonable based upon a consideration of economic and

16

environmental factors, including, without limitation, other

17

practicable alternative alignments, utility corridors and

18

easements, minimum clear zones and other safety standards, and

19

further provide that placement of the electric utility

20

transmission lines within the department's right-of-way does not

21

interfere with operational requirements of the transportation

22

facility or planned or potential future expansion of such

23

transportation facility. If the department approves longitudinal

24

placement of electric utility transmission lines in limited

25

access facilities, compensation for the use of the right-of-way

26

is required. Such consideration or compensation paid by the

27

electric utility in connection with the department's issuance of

28

a permit does not create any property right in the department's

29

property regardless of the amount of consideration paid or the

30

improvements constructed on the property by the utility. Upon

31

notice by the department that the property is needed for

32

expansion or improvement of the transportation facility, the

33

electric utility transmission line will relocate from the

34

facility at the electric utility's sole expense. The electric

35

utility shall pay to the department reasonable damages resulting

36

from the utility's failure or refusal to timely relocate its

37

transmission lines. The rules to be adopted by the department

38

may also address the compensation methodology and relocation. As

39

used in this subsection, the term "base load generating

4/16/2008  4:52:00 PM     EP.37.07764

CODING: Words stricken are deletions; words underlined are additions.