| 1 | Representative Cannon offered the following: | 
| 2 | 
 | 
| 3 | Amendment (with title amendment) | 
| 4 | Remove line(s) 697-727 and insert: | 
| 5 | maintain the adopted level of service. If the number of trips | 
| 6 | used in this calculation includes trips from an earlier phase of | 
| 7 | development, the determination of mitigation of the cumulative | 
| 8 | project impacts for the subsequent phase of development shall | 
| 9 | include a credit for any mitigation required by the development | 
| 10 | order and provided by the developer for the earlier phase, | 
| 11 | calculated at present value. For purposes of this subsection, | 
| 12 | the term: | 
| 13 | 1.  "Present value" means the fair market value of right- | 
| 14 | of-way at the time of contribution or the actual dollar value of | 
| 15 | the construction improvements at the date of completion. | 
| 16 | 2. For purposes of this subsection,"Construction cost" | 
| 17 | includes all associated costs of the improvement. Proportionate- | 
| 18 | share mitigation shall be limited to ensure that a development | 
| 19 | of regional impact meeting the requirements of this subsection | 
| 20 | mitigates its impact on the transportation system but is not | 
| 21 | responsible for the additional cost of reducing or eliminating | 
| 22 | backlogs. | 
| 23 | 3.  "Backlogged transportation facility" means a facility | 
| 24 | on which the adopted level-of-service standard is exceeded by | 
| 25 | the existing level of service plus committed trips. A developer | 
| 26 | may not be required to fund or construct proportionate share | 
| 27 | mitigation that is more extensive, due to being on a backlogged | 
| 28 | transportation facility, than is necessary based solely on the | 
| 29 | impact of the development project being considered. | 
| 30 | 
 | 
| 31 | This subsection also applies to Florida Quality Developments | 
| 32 | pursuant to s. 380.061 and to detailed specific area plans | 
| 33 | implementing optional sector plans pursuant to s. 163.3245. | 
| 34 | 
 | 
| 35 | ----------------------------------------------------- | 
| 36 | T I T L E  A M E N D M E N T | 
| 37 | Remove line(s) 16 and insert: | 
| 38 | proportionate share requirements; providing for the | 
| 39 | determination of mitigation to include credit for certain | 
| 40 | mitigation provided under an earlier phase, calculated at | 
| 41 | present value; defining the terms "present value" and | 
| 42 | "backlogged transportation facility"; |