Florida Senate - 2020 SB 452
By Senator Rodriguez
37-00647-20 2020452__
1 A bill to be entitled
2 An act relating to electric vehicle charging stations;
3 creating s. 339.287, F.S.; defining the term “master
4 plan for electric vehicle charging stations” or
5 “master plan”; requiring the Department of
6 Transportation, in coordination with the Office of
7 Energy within the Department of Agriculture and
8 Consumer Services and the Florida Clean Cities
9 Coalitions, or other appropriate entities, to develop
10 and adopt by a specified date a master plan for
11 electric vehicle charging stations on the state
12 highway system; specifying goals and objectives of the
13 master plan; requiring the master plan to be updated
14 annually by a specified date; providing an effective
15 date.
16
17 Be It Enacted by the Legislature of the State of Florida:
18
19 Section 1. Section 339.287, Florida Statutes, is created to
20 read:
21 339.287 Electric vehicle charging stations; master plan
22 requirements.—
23 (1) As used in this section, the term “master plan for
24 electric vehicle charging stations” or “master plan” means a
25 comprehensive plan of the department which describes current and
26 future plans for the development of electric vehicle charging
27 stations on the state highway system.
28 (2) The department, in coordination with the Office of
29 Energy within the Department of Agriculture and Consumer
30 Services and the Florida Clean Cities Coalitions designated by
31 the United States Department of Energy, or other appropriate
32 public or private entities, shall develop and adopt a master
33 plan for electric vehicle charging stations on the state highway
34 system by July 1, 2021.
35 (3) The goals and objectives of the master plan include,
36 but are not limited to, all of the following:
37 (a) Identify optimal locations on the state highway system
38 for the development of electric vehicle charging stations as a
39 means of facilitating electric vehicle short-range and long
40 range travel and adequately serving evacuation routes in this
41 state.
42 (b) Identify locations that would serve existing electric
43 vehicles or encourage the expansion of electric vehicle use in
44 this state.
45 (c) Evaluate and compare the types of electric vehicle
46 charging stations available at present and in the future,
47 including the technology and infrastructure incorporated in such
48 stations, for the purpose of identifying any advantages to
49 developing a particular type of station.
50 (d) Evaluate the economic potential for electric vehicle
51 charging stations in this state and consider strategies to
52 develop that potential, including, but not limited to, methods
53 of building partnerships with local governments, other state and
54 federal entities, electric utilities, the business community,
55 and the public in support of electric vehicle charging stations.
56 (e) Identify specific projects that will accomplish the
57 goals and objectives of this section.
58 (4) After its adoption, the master plan shall be updated
59 annually by July 1.
60 Section 2. This act shall take effect upon becoming a law.