Community Budget Issue Requests - Tracking Id #437 |
Stormwater System Improvements for Palmetto Bay |
|
Requester: |
Charles Scurr, Village Manager |
Organization: |
Village of Palmetto Bay |
|
Project Title: |
Stormwater System Improvements for Palmetto Bay |
Date Submitted |
1/14/2005 2:20:31 PM |
|
Sponsors: |
Margolis |
|
Statewide Interest: |
Reduces flooding and resulting hazardous conditions which pose a threat to public health and safety, property and the environment |
|
Recipient: |
Village of Palmetto Bay |
|
Contact: |
Olga Cadaval |
|
|
8950 SW 152 Street |
|
Contact Phone: |
(305) 259-1234 |
|
|
Palmetto Bay 33157 |
|
Contact email: |
ocadaval@palmettobay-fl.gov |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The construction of catch basins and exfiltration trenches at various strategic locations to control flooding and other hazards associated with stormwater surges. The project will reduce pollutant loadings to Biscayne Bay. |
|
Is this a project related to 2004 hurricane damage? |
No |
|
Measurable Outcome Anticipated: |
Improved disaster response capabilities and emergency management |
|
Amount requested from the State for this project this year: |
$500,000 |
|
Total cost of the project: |
$1,000,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$500,000 |
|
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2003-2004 |
Amount: |
$200,000 |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Village of Palmetto Bay Stormwater Master Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Village of Palmetto Bay Council |
|
Hearing Meeting Date: |
12/06/2004 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
SW20022172 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Stormwater Master Plan, p. 46 and p. 78 |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
500000 |
|
Match Source: |
WMD |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
The installation of the proposed infiltration systems will provide increased water quality treatment, thus reducing loadings to Biscayne Bay. Two separate sub-basins are proposed in this phase of the project. Sub-basin #1 will yield the following reductions: Phosphorus Load Reduction = 24 kg/yr, Nitrogen Load Reduction = 187 kg/yr, Total Suspended Solids Load Reduction = 2266 kg/yr. Sub-basin #7 will yield the following reductions: Phosphorus Load Reduction = 27 kg/yr, Nitrogen Load Reduction = 207 kg/yr, Total Suspended Solids Load Reduction = 2515 kg/yr |
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |