|
Community Budget Issue Requests - Tracking Id #442 |
Cambridge Basin - Drainage/Stormwater Improvements (North) |
|
Requester: |
Ken Parker - City Manager |
Organization: |
City of Port Orange |
|
Project Title: |
Cambridge Basin - Drainage/Stormwater Improvements (North) |
Date Submitted |
1/12/2005 4:43:39 PM |
|
Sponsors: |
Lynn |
|
Statewide Interest: |
Yes the project alleviates severe residential flooding problems and improves water quality of stormwater runoff prior to discharging into Rose Bay and Outstanding Florida Water (OFW) |
|
Recipient: |
City of Port Orange |
|
Contact: |
Ken Parker |
|
|
1000 City Center Circle |
|
Contact Phone: |
(386) 506-5501 |
|
|
Port Orange 32129 |
|
Contact email: |
kparker@port-orange.org |
|
Counties: |
Volusia |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Construct a stormwater pond and other drainage improvements to divert stormwater runoff and treat the water before it is discharged into a natural estuary and Outstanding Florida Water (OFW) - Rose Bay. The hurricanes of 2004 produced a large amount of rainwater and as a result over 200 homes in Port Orange were flooded. The vast majority of those homes are in the Cambridge Basin. |
|
Is this a project related to 2004 hurricane damage? |
Yes |
Have you applied for financial assistance from FEMA? |
No |
|
Measurable Outcome Anticipated: |
Decrease flooding problems and increase public health and storm water treatment. |
|
Amount requested from the State for this project this year: |
$1,250,000 |
|
Total cost of the project: |
$2,500,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$1,250,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
Yes |
|
Agency |
Environmental Protection, Department Of |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
No |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Volusia County Legislative Delegation |
|
Hearing Meeting Date: |
01/06/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
St. Johns River Water Management District, Northern Coastal Basin SWIM program on page 8. |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
St. Johns Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
1250000 |
|
Match Source: |
Other grants & City Drainage fund |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Northern Coastal Basin/Halifax River/RoseBay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
This project will have a major impact on achieving reduction TMDL goals for the Halifax River established by the FDEP by limiting and eliminating the loading of suspended solids, nitrogen, phorsphorus and toher contaminants into the river. |
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |