|
Community Budget Issue Requests - Tracking Id #527 |
Village of Biscayne Park Flood PRO |
|
Requester: |
John Hornbuckle |
Organization: |
Village of Biscayne Park |
|
Project Title: |
Village of Biscayne Park Flood PRO |
Date Submitted |
1/14/2005 2:20:49 PM |
|
Sponsors: |
Margolis, Wilson |
|
Statewide Interest: |
Is intended to produce measurable results and to meet documented needs. |
|
Recipient: |
Village of Biscayne Park |
|
Contact: |
Joe Fisher/Tom Calderon |
|
|
640 NE 114 Street |
|
Contact Phone: |
(305) 899-8000 |
|
|
Biscayne Park 33161 |
|
Contact email: |
tcalderon@biscaynepark.gov |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Repair and replacement and improvement of our French drain, dry well & storm water |
|
Is this a project related to 2004 hurricane damage? |
No |
|
Measurable Outcome Anticipated: |
To better serve the community's need in storm water and flood control |
|
Amount requested from the State for this project this year: |
$400,000 |
|
Total cost of the project: |
$850,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$450,000 |
|
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2004-2005 |
Amount: |
$100,000 |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$450,000 |
To Fund: |
Construction |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
An original study by FIU civil engineering dept. plus ongoing engineering work by A/P Engineering |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Biscayne Park Commission, Miami-Dade Legislative Delegation |
|
Hearing Meeting Date: |
11/12/2004 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
SW2003256 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Miami-Dade County Local Mititgation Plan |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
450000 |
|
Match Source: |
General fund |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay/Biscayne Canal |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
Better drainage will reduce the run-off into Biscayne Canal, which runs into Biscayne Bay |
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |