| |
| Community Budget Issue Requests - Tracking Id #136 |
| Duck Pond Area Drainage Improvements |
| |
| Requester: |
Edith Stewart |
Organization: |
Hillsborough County Government |
| |
| Project Title: |
Duck Pond Area Drainage Improvements |
Date Submitted |
1/13/2006 3:26:59 PM |
| |
| Sponsors: |
Crist |
| |
| Statewide Interest: |
| Mitigation of flooding to storm victims during extraordinary storm events through the Department of Community Affairs Local Mitigation Strategy Working Group. |
| |
| Recipient: |
Hillsborough County Government |
|
Contact: |
Edith Stewart |
|
| |
601 E. Kennedy Blvd |
|
Contact Phone: |
(813) 276-2640 |
|
| |
Tampa 33602 |
|
Contact email: |
|
| |
| Counties: |
Hillsborough |
| |
| Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
| |
| Project Description: |
| Duck Pond area was flooded during hurrican Frances which includes 22nd Street, 17th Street, 15th Street, and Fowler Avenue. Duck Pond watershed is located in northern Hillsborough County. The total drainage area north of Fowler Avenue is approximately 2,243 acres and about 1,500 acres will flow to Duck Pond West (DPW) first, and then go to Duck Pond East (DPE) via a 72" RCP. The potential solutions for this system include: 1)Provide a "Stormwater Regional Detention Pond" at upstream of DPW area which can be located near the 22nd Street and Fletcher Avenue, 2)Upgrade the internal drainage system between DPW, DPE,and Fowler Avenue cross-drain, and 3)Install a pump station at DPE to divert glow into 30th Street drainage system located within City of Tampa and ultimately discharges into Hillsborough River. |
| |
| Is this a project related to a federal or state declared disaster? |
No |
| |
| Measurable Outcome Anticipated: |
| Prevent repetitive flood-loss to neighborhoods, businesses, and public roads; improve discharge quality to receiving waters and to improve connections between existing drainage systems. |
| |
| Amount requested from the State for this project this year: |
$1,635,398 |
| |
| Total cost of the project: |
$8,450,000 |
| |
| Request has been made to fund: |
Construction |
| |
| What type of match exists for this project? |
Local |
| |
Cash Amount |
$5,714,602 |
|
| |
| Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2005-2006 |
Amount: |
$1,100,000 |
| |
| Is future-year funding likely to be requested? |
|
No |
| |
| Was this project included in an Agency's Budget Request? |
|
No |
| |
| Was this project included in the Governor's Recommended Budget? |
No |
| |
| Is there a documented need for this project? |
Yes |
| |
Documentation: |
Communitywide Local Mitigation Strategy (LMS) Working Group and updated LMS documentation |
| |
| Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
| |
Hearing Body: |
Hillsborough County Board of County Commissioners |
| |
Hearing Meeting Date: |
01/07/2006 |
| |
| Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
| Has the project been submitted to the Department of Environmental Protection? |
Yes |
| DEP identifying number: |
2005087 |
| Is this project eligible under section 403.885(5) F.S.? |
Yes |
| |
| Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
| Name the plan and cite the pages on which the project is described: |
| Local Mitigation Stragedy |
| |
| If you are requesting funding for a stormwater or surface water restoration project: |
| |
| Which Water Management District has the jurisdiction of your project? |
| |
SWFMD |
| Have you provided at least 50% match? |
Yes |
| |
Match Amount: |
5714602 |
| |
Match Source: |
Local |
| |
| Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
| |
Name of water body: |
Tampa Bay |
| |
| Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
| |
| |
| If you are requesting funding for a wastewater project: |
| |
| Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
| |
| Other wastewater projects: |
| |
| Have you received previous legislative funding for this project? |
No |
| |
| Is the project under construction? |
No |
| |
| Have you provided at least a 25% local match? |
No |