| Community Budget Issue Requests - Tracking Id #180 |
| South Miami-Dade Watershed Sub-Basin C103N-S-5A Retrofitting |
| |
| Requester: |
Antonio Cotarelo, P.E. |
Organization: |
Miami-Dade Department of Environmental Resources Management |
| |
| Project Title: |
South Miami-Dade Watershed Sub-Basin C103N-S-5A Retrofitting |
Date Submitted |
1/5/2006 1:41:26 PM |
| |
| Sponsors: |
Bullard |
| |
| Statewide Interest: |
| The project will help reduce pollutant loads discharged into the C-103 Canal, which ultimately discharges to Biscayne Bay, a protected body of water under State of Florida guidelines. Therefore, this project will contribute to help Biscayne Bay attain state ambient water quality standards while positively contributing to the aesthetics and increased standard of living in the benefited community. |
| |
| Recipient: |
Miami-Dade Department of Environmental Resources Management |
|
Contact: |
Antonio Cotarelo, P.E. |
|
| |
33 SW 2nd Avenue, PH 2 |
|
Contact Phone: |
(305) 372-6950 |
|
| |
Miami 33130 |
|
Contact email: |
cotara@miamidade.gov |
| |
| Counties: |
Dade |
| |
| Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
| |
| Project Description: |
| This request is based on the implementation of a control measure recommended by the Stormwater Master Plan in the C-103 hydrologic basin. The C-103 basin is a component of the South Miami Dade Watershed. the goal of this control measure is to retrofit sice (6) existing outfalls into the C-103 canal. Currently, these outfalls discharge stormwater runoff without pre-treatment. This control measure proposes to retrofit the area with approximately 7,500 feet of exfiltration drains to treat the stormwater before discharing into the waterbody. This request also proposes to build six (6) new pollution control structures prior to discharging into the canal. |
| |
| Is this a project related to a federal or state declared disaster? |
No |
| |
| Measurable Outcome Anticipated: |
| The project goal, once implemented, is to attenuate the heaviest loads of pollutants generated by the initial wash off of the watershed to surface waters (C-103 canal), which is caused by the effect of the first inch of runoff over its area. The runoff generated over the basin will be routed through a treatment train consisting of exfiltration trenches and pollution control structures installed as part of this project to reduce the amount of urban runoff going into the C-103 canal. |
| |
| Amount requested from the State for this project this year: |
$726,500 |
| |
| Total cost of the project: |
$1,453,000 |
| |
| Request has been made to fund: |
Construction |
| |
| What type of match exists for this project? |
Local |
| |
Cash Amount |
$726,500 |
|
| |
| Was this project previously funded by the state? |
|
No |
| |
| Is future-year funding likely to be requested? |
|
No |
| |
| Was this project included in an Agency's Budget Request? |
|
No |
| |
| Was this project included in the Governor's Recommended Budget? |
No |
| |
| Is there a documented need for this project? |
Yes |
| |
Documentation: |
South Miami-Dade Watershed Planning Stormwater Modeling Component, Phase II: C-103 Canal |
| |
| Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
| |
Hearing Body: |
Miami-Dade Board of County Commissioners |
| |
Hearing Meeting Date: |
11/15/2005 |
| |
| Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
| Has the project been submitted to the Department of Environmental Protection? |
No |
| Is this project eligible under section 403.885(5) F.S.? |
Yes |
| |
| Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
| Name the plan and cite the pages on which the project is described: |
| South Miami-Dade Watershed Planning Stormwater Modeling Component, Phase II: C-103 Canal, North Canal and Florida City Basin |
| |
| If you are requesting funding for a stormwater or surface water restoration project: |
| |
| Which Water Management District has the jurisdiction of your project? |
| |
South Florida Water Management Distirct |
| Have you provided at least 50% match? |
Yes |
| |
Match Amount: |
726500 |
| |
Match Source: |
Miami-Dade County Stormwater Utility |
| |
| Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
| |
Name of water body: |
Biscayne Bay |
| |
| Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
| |
| |
| If you are requesting funding for a wastewater project: |
| |
| Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
| |
| Other wastewater projects: |
| |
| Have you received previous legislative funding for this project? |
No |
| |
| Is the project under construction? |
Yes |
| |
| Have you provided at least a 25% local match? |
Yes |
| |
Amount: |
726500 |
Source: |
Miami-Dade County Stormwater Utility |