| |
| Community Budget Issue Requests - Tracking Id #921 |
| Town of Bay Harbor Islands Community Enhancements Program Phase IV Sotrmwater Component |
| |
| Requester: |
Greg Tindle, Town Manager |
Organization: |
Town of Bay Harbor Islands |
| |
| Project Title: |
Town of Bay Harbor Islands Community Enhancements Program Phase IV Sotrmwater Component |
Date Submitted |
1/9/2006 1:09:28 PM |
| |
| Sponsors: |
Margolis |
| |
| Statewide Interest: |
| General interests for stormwater clean-up and water quality improvement to Biscayne Bay. |
| |
| Recipient: |
Town of Bay Harbor Islands |
|
Contact: |
JC Jimenez, Assistant to the T |
|
| |
9665 Bay Harbor Terrace |
|
Contact Phone: |
(305) 866-6241 |
|
| |
Bay Harbor Islands 33154 |
|
Contact email: |
bhitown@bellsouth.net |
| |
| Counties: |
Dade |
| |
| Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
| |
| Project Description: |
| Phase IV of teh Community Enhancement Project is currently in the design stage, consisting of the west island south of Kane Concourse. This area consists of approximately 11 of these isolated inlet systems that collect excess stormwater runoff and discharge it directly into Biscayne Bay at 11 pipe outfall locations. These drainage systems currently do not provide any water quality treatment. In order to provide stormwater quality treatment, it is anticipated that a drainage system similar to the system used in Phase I will be constructed. The improvements in Phase IV include reducing the total number of existing outfalls, interconnecting the multiple drainage systems using an average pipe diameter of 30", placing weirs and flap gate in the first drainage structure upstream to each outfall, and adding 4 stormwater injection wells to be fed by a single pump rated at 9,000 gallons per minute. |
| |
| Is this a project related to a federal or state declared disaster? |
No |
| |
| Measurable Outcome Anticipated: |
| Reduced flood levels and stormwater treatment. |
| |
| Amount requested from the State for this project this year: |
$2,000,000 |
| |
| Total cost of the project: |
$6,500,000 |
| |
| Request has been made to fund: |
Construction |
| |
| What type of match exists for this project? |
Local |
| |
Cash Amount |
$4,500,000 |
|
| |
| Was this project previously funded by the state? |
|
No |
| |
| Is future-year funding likely to be requested? |
|
No |
| |
| Was this project included in an Agency's Budget Request? |
|
No |
| |
| Was this project included in the Governor's Recommended Budget? |
No |
| |
| Is there a documented need for this project? |
Yes |
| |
Documentation: |
Town of Bay Harbor Islands Stormwater Master Plan-1996, National Pollutant Discharge Elmination Syst |
| |
| Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
| |
Hearing Body: |
Bay Harbor Islands Town COuncil and Miami Dade Legislative Delegation |
| |
Hearing Meeting Date: |
11/30/2005 |
| |
| Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
| Has the project been submitted to the Department of Environmental Protection? |
No |
| Is this project eligible under section 403.885(5) F.S.? |
Yes |
| |
| Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
| Name the plan and cite the pages on which the project is described: |
| Town of Bay Harbor Islands Stormwater Master Plan, 1996 and Miami Dade County Local Mitigation Strategy |
| |
| If you are requesting funding for a stormwater or surface water restoration project: |
| |
| Which Water Management District has the jurisdiction of your project? |
| |
SFWMD |
| Have you provided at least 50% match? |
Yes |
| |
Match Amount: |
4500000 |
| |
Match Source: |
General Fund |
| |
| Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
| |
Name of water body: |
Biscayne Bay |
| |
| Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
| |
| |
| If you are requesting funding for a wastewater project: |
| |
| Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
| |
| Other wastewater projects: |
| |
| Have you received previous legislative funding for this project? |
No |
| |
| Is the project under construction? |
No |
| |
| Have you provided at least a 25% local match? |
No |