SB 1482: Electric Utility 10-year Site Plans
GENERAL BILL by Bernard
Electric Utility 10-year Site Plans; Revising requirements for estimates included in the 10-year site plan; requiring the Florida Public Service Commission to issue a final order within a specified timeframe after receiving a proposed plan; authorizing the commission to reject such plan under certain circumstances; requiring electric utilities to submit a revised plan within a specified timeframe upon such rejection, etc.
Senate Committee References:
-
Bill History
Date Chamber Action 1/8/2026 Senate • Filed
1/16/2026 Senate • Referred to Regulated Industries; Appropriations Committee on Agriculture, Environment, and General Government; Fiscal Policy
1/22/2026 Senate • Introduced
-
SB 1482, Original Filed Version (Current Bill Version) Posted 1/8/2026 at 3:01 PM
Bill Text: Web Page | PDF Analyses: None Related Bills (2)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills S 1484 Fees/Florida Public Service Commission Bernard Linked Last Action: 1/22/2026 S Introduced
H 1145 Electric Utility Ten-year Site Plans Maggard Similar Last Action: 1/13/2026 H 1st Reading (Original Filed Version)
Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 186.801 Ten-year site plans. Page 2 (pdf)